    Quote Originally Posted by jordanbasset View Post
    Hi, are these still the current times - many thanks
    Also - is the bridge repair on target to return by the 8th May???

  2. #22
    Join Date
    Jan 2003
    Posts
    123

    Default

    Quote Originally Posted by Chris_Robb View Post
    Also - is the bridge repair on target to return by the 8th May???
    Yes the times are still current. I'm not sure about when the bridge is due to return though, it's anyones guess, this is Greece!

  3. #23
    Join Date
    Jan 2003
    Posts
    123

    Default

    Lefkas Floating Bridge returned to its normal position this afternoon. I assume that hourly openings will resume.
    Attached Images Attached Images

  4. #24
    Chris_Robb's Avatar
    Chris_Robb is offline Registered User
    Location : Haslemere/ Leros Greece
    Join Date
    Jun 2001
    Posts
    5,881

    Default

    Quote Originally Posted by lurob View Post
    Lefkas Floating Bridge returned to its normal position this afternoon. I assume that hourly openings will resume.
    Thats good news!

  5. #25

    Default Bridge back

    Bridge back now guys.